The report focuses on the process optimization problem of X70 connecting rod machining process. By drawing on mature process plans and three-dimensional environmental analysis, the X70 connecting rod machining process is optimized. The main measures are to integrate the processes (including upper and lower precision milling, milling 4) × 45 ° chamfering, milling R50 and other features above and below are completed in one process and two workstations, with allowance adjustment (large head hole is directly roughly milled to the size before precision boring), processing method change (R50 fillet is changed from boring to using R50 ball end milling cutter, and tool inspection R203 is changed from Φ sixty-three × 160 adjusted to R50 ball end milling cutter processing; And accompanied by accompanying tooling, achieving fast positioning clamping effect, improving the work instructions, so that the produced connecting rods can meet the requirements of drawings and technical documents. This process has reference significance for other similar connecting rod processes in the future. The report also plans for the future production line, moving towards automation as the facilities are gradually matched and the production line is reasonably organized in the later stage.<br>The content of this report is complete and accurate, meeting the writing requirements. After discussion, the report passed the review.
正在翻译中..