Cumene will flow up through OEC inventorying the remainder of the column. Cumene will overflow and begin to inventory the SCWC. It may be necessary to drain some water from the bottom of the OEC to make room at the top to establish an interface level at LIC-24175. It will be helpful to drain water from the bottom of the SCWC if any accumulates before caustic feed begins.