Newly-built lines should adopt double-circuit overhead erection on the same tower. In areas where the line corridors are particularly tight, multiple overhead lines (including mixed pressure) can be built on the same tower. In narrow sections where angle steel towers cannot be erected, the lines can be erected with steel pipe poles. <br>The cable route in the urban area should be arranged uniformly with other underground pipelines in the city. The width and depth of the passage should consider the requirements of long-term development. The laying of cables should consider the requirements of safety, convenient maintenance and saving investment. The cable laying method should be determined based on the voltage level, the final number of circuits, construction conditions and initial investment and other factors, and the corresponding laying methods can be adopted according to different situations [13]. <br>The selection of the transmission line path plan should be based on the basic principles of overall planning and mutual coordination, and be determined according to the following specific principles:
正在翻译中..