Now we want to make sure that the design can be optimized are other post, please Mr. Williom E · Kennick priority with the design, or drawing stage to optimize expression does not make sense
Now we want to confirm that the design, the others are later can be optimized, please Mr. Kenneker priority with the design, otherwise at this stage to optimize the surface expression has no meaning
Now what we want to confirm is the design, and others can be optimized in the later stage. Please give priority to cooperate with the design, otherwise there is no significance in optimizing the drawing expression at this stage<br>