For Major Transmission or CAPEX Project, the Performance Security shall cover at the minimum the period from the date of Contract signing until the final acceptance of the project which includes defects liability period plus thirty (30) days.
For Major Transmission or CAPEX Project, the Performance Security shall cover at the minimum the period from the date of Contract signing until the final acceptance of the project which includes defects liability period plus thirty (30) days.