长期以来,受历史原因和客观条件的制约,电网规划的重点是1l0kV及以上电压等级的电网规划,在一定程度上忽略了中低配网规划工作,而低压配网规划的英语翻译

长期以来,受历史原因和客观条件的制约,电网规划的重点是1l0kV及以上

长期以来,受历史原因和客观条件的制约,电网规划的重点是1l0kV及以上电压等级的电网规划,在一定程度上忽略了中低配网规划工作,而低压配网规划则基本上未考虑过,例如在《A市电网十一五发展规划》中,只在电网规划文木中设置了一章节的内容阐述中低压配网规划,可见中低压配网规划未引起足够的重视,导致配电网建设规划远远滞后于高压输电系统的建设规划,长期以来未建立系统化的中低压配网规划工作制度和以目标网架为核心的项目管理体制[2]。国内外目前对于中压配网规划中的规划方法、负荷预测、接线模式等各类专题都有了较为深入的探讨和研究,但是主要集中在数学模型等理论研究方面,结合实际情况的应用较少。而对于低压配网规划的探讨只简单的停留在低压配网供电方式、导线截面、配变布点、电杆金具选型等技术原则的层面,结合实际情况的低压配网规划基本是一片空白[3]。配网规划工作常采用对外委托的方式完成,山于外委人员的专业技能欠缺,对现状分析基本成摆设,未切中要害,与中低压配网现状基本脱节,缺少结合实际情况,指导实际中低压配网建设的内容,缺少对现有110kV配网存在的问题及其原因进行全面分析、查找与总结,并在此基础上提出110KV配电网的规划方法和项目建设、工程设一计、专业技能培养方面的优化措施。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
For a long time, restricted by historical reasons and objective conditions, the focus of power grid planning has been power grid planning with voltage levels of 110kV and above. To a certain extent, it has neglected the planning of low and medium distribution networks, while the low-voltage distribution network planning has basically not considered. For example, in the "Eleventh Five-Year Development Plan for the Power Grid of City A", only one chapter is set up in the power grid planning text to describe the medium and low voltage distribution network planning. It can be seen that the medium and low voltage distribution network planning has not attracted enough attention, leading to The power grid construction plan lags far behind the construction plan of the high-voltage power transmission system. For a long time, a systematic planning work system for medium and low voltage distribution network and a project management system centered on the target grid has not been established [2]. <br>At present, domestic and foreign countries have conducted in-depth discussions and studies on various topics such as planning methods, load forecasting, and wiring patterns in medium voltage distribution network planning. However, they mainly focus on theoretical research such as mathematical models, and the application in combination with actual conditions is more important. less. The discussion on low-voltage distribution network planning simply stays at the level of technical principles such as low-voltage distribution network power supply mode, conductor cross-section, distribution points, and pole fittings selection. The low-voltage distribution network planning based on actual conditions is basically a blank.[ 3]. Distribution network planning is often completed by means of external entrustment. Shanyu’s external commissioners lack professional skills, and the analysis of the status quo is basically a decoration, and it is basically out of touch with the status quo of the medium and low voltage distribution network. It lacks a combination of actual conditions and guidance in practice. The content of low-voltage distribution network construction lacks a comprehensive analysis, search and summary of the existing 110kV distribution network problems and their causes, and on this basis, the 110KV distribution network planning method, project construction, and engineering design are proposed. Optimization measures for professional skills training.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
For a long time, by historical reasons and objective conditions, the focus of power grid planning is 1l0kV and above voltage level of power grid planning, to a certain extent, ignored the low-to-medium distribution network planning work, and low-voltage distribution network planning is basically not considered, for example, in the "A City Grid 11th Five-Year Development Plan", only set up a chapter in the grid planning text to explain the content of low-voltage distribution network planning, it can be seen that the low-voltage distribution network planning did not cause enough attention. The construction planning of distribution network lags far behind the construction planning of high-voltage transmission system, and the systematic system of medium and low voltage distribution network planning and the project management system with the target network frame as the core have not been established for a long time.<br>At present, there are more in-depth discussions and studies on various topics such as planning methods, load prediction and wiring patterns in the planning of medium voltage distribution networks at home and abroad, but they are mainly concentrated in theoretical research such as mathematical models, which are applied less in combination with the actual situation. And for the low-voltage distribution network planning discussion is only a simple stay in the low-voltage distribution network power supply mode, wire cross-section, distribution cloth point, electric rod gold selection and other technical principles of the level, combined with the actual situation of low-voltage distribution network planning is basically a blank. Distribution network planning work is often done by means of external entrustment, mountain in the foreign committee personnel's lack of professional skills, analysis of the status quo is basically set up, not cut into the key, and the status quo of low-voltage distribution network is basically out of touch, lack of combined with the actual situation, guide the actual construction of low-voltage distribution network content, lack of existing 110kV distribution network problems and their reasons for a comprehensive analysis, find and summarize, and on this basis put forward 110KV distribution network planning methods and project construction. Optimization measures for professional skills development.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
For a long time, restricted by historical reasons and objective conditions, the focus of power grid planning is the power grid planning of 1kV and above voltage level. To a certain extent, the planning of medium and low voltage distribution network has been ignored, while the planning of low voltage distribution network has not been considered. For example, in the 11th five year development plan of power grid of city a, only a chapter of medium and low voltage distribution network has been set up in the power grid planning It can be seen from the distribution network planning that the medium and low voltage distribution network planning has not attracted enough attention, which leads to the distribution network construction planning lagging far behind the construction planning of high voltage transmission system. For a long time, the systematic medium and low voltage distribution network planning system and the project management system with the target grid as the core have not been established [2].<br>At present, there are more in-depth discussions and researches on the planning method, load forecasting, connection mode and other topics in the medium voltage distribution network planning at home and abroad, but they mainly focus on the theoretical research such as mathematical model, and the application combined with the actual situation is less. However, the discussion of low-voltage distribution network planning simply stays at the level of technical principles such as power supply mode, conductor section, distribution transformer distribution points, pole fittings selection, etc. the low-voltage distribution network planning combined with the actual situation is basically a blank [3]. Distribution network planning is often completed by means of external entrustment. Due to the lack of professional skills of the outsourcing personnel, the analysis of the current situation is basically a decoration, which is not to the point. It is basically out of touch with the current situation of the medium and low voltage distribution network. It lacks the content to guide the actual construction of the medium and low voltage distribution network in combination with the actual situation, and it lacks the comprehensive analysis, search and summary of the existing problems and their causes of the 110 kV distribution network On this basis, it puts forward the planning method of 110kV distribution network and the optimization measures of project construction, engineering design and professional skills training.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: