1. The erection of the template must accurately capture the geometric dimensions of the components to guarantee the accuracy of the axis position. 2. The formwork must have sufficient strength, rigidity and stability and be capable of reliably supporting the weight, lateral pressure and construction load of the newly poured concrete. Before pouring, check that the rolling frame and the reinforced support fixings are tight.