After the pouring of ordinary concrete has been completed, it shall be watered continuously for more than 7 days, and the watering maintenance time of large-volume concrete shall not be less than 14 days. Large volume concrete should take temperature measurement measures, at any time to grasp the internal, surface and atmospheric ambient temperature of concrete, to ensure that the temperature difference of adjacent interface does not exceed 25 degrees C.
正在翻译中..