1, the early EST-A switch black do not spray rain scrape fixed cover there is such a problem, after the R-D change it to a piece supply;<br>2, at this stage GTL switch the same type of cover, does not require the supplier assembly supply;<br>3, technical requirements after paste placed 8-12 hours, assembly can not meet the technical requirements, resulting in the seal sticky problem
正在翻译中..