For traction models: The final inspection needs to provide faulty cars or problem videos, photos and models. For <br>the stuck problem, pull the supervisor design and AUDIT for review. Standards are agreed. <br>Incorporate the problem of the side sign lights/side turn signals/signal lights not being integrated into the comprehensive control, and South Square confirms the repair status. <br>Temporary inspection standards are formed according to the way of dropping, and the inspectors are trained to focus on controlling the dropping phenomenon. Statistics the failure rate. <br>In response to the problem of abnormal sound of door opening and closing, it is required to feedback the fault point video to the improvement group to <br>organize external inspection, procurement, and R&D to evaluate together according to the supplier, and improve <br>according to the evaluation situation. According to the summary of electrical problems, the two ends of the connector Check the quality of the parts <br>. The problem that the lock hook cannot be screwed requires external inspection to pull the supplier's on-site service. The external inspection of the lock hook pulls the supplier's guarantee, and controls the incoming parts according to the size requirements marked on the drawing. (On-site inspection for unqualified products) <br>Compare and check the complete set of faulty and non-faulty parts of the faulty car. <br>"Project transfer to manufacturing. <br>1. Make OK standards for the wiring harness rubber cap installation, and pull the quality to confirm on the spot. <br>2. The harness is not installed in place. "100% online repair" <br>pulls the designer to confirm the problem. If increasing the torque value can eliminate the problem, it is recommended to write a contact form to request the design to change the torque requirements. <br>Re-receipt the project and issue an improvement plan by next Tuesday. <br>Organize the general assembly and quality personnel to conduct trial assembly review according to the trial assembly plan, and issue a change order after the verification measures are qualified. <br>Re-evaluate the problem of abnormal noise at the junction after the car, and issue an improvement plan to <br>implement the second trial installation time, and organize relevant personnel to conduct a trial installation review <br>technology to determine whether the film needs to be distinguished between winter and summer. If necessary, Clarify the difference between the two states and whether there is a difference in adhesive strength. <br>Provide an upgrade report for <br>procurement , and upgrade the problem. Procurement Department organizes relevant units to conduct a sample review of the film.
正在翻译中..