针对牵引车型:终检需提供故障车或问题视频、照片及车型针对卡滞问题拉动主管设计和AUDIT进行评审。标准达成一致。将侧标志灯/侧转向灯/示廓灯的英语翻译

针对牵引车型:终检需提供故障车或问题视频、照片及车型针对卡滞问题拉动主

针对牵引车型:终检需提供故障车或问题视频、照片及车型针对卡滞问题拉动主管设计和AUDIT进行评审。标准达成一致。将侧标志灯/侧转向灯/示廓灯不亮问题纳入综合进行控制,南广场确认返修状态。按脱落方式形成临时检验标准,培训检查员对脱落现象进行重点控制。统计脱落故障率。针对车门开启关闭异响问题要求对故障点拍视频进行反馈到改进群内组织外检,采购,研发一起按供应商进行评估,根据评估情况进行改进根据汇总的电器类问题对插接件两端零部件质量进行检查锁钩拧不动的问题要求外检拉动供应商现场服务。锁钩尺寸外检拉动供应商保证,并按照图纸标示的尺寸要求对来件进行控制。(现场排查存在不合格品)对故障车拆除整套故障件和非故障件进行对比检查"项目转制造1、针对线束胶帽安装制定OK标准,并拉动质量进行现场确认2、线束未装到位要求100%在线返修"拉动设计人员对问题进行确认,如增加力矩值可以消除问题,建议写联系单要求设计更改力矩要求。针对项目重新进行回执,并于下周二前出具改进方案。组织总装及质量人员按试装计划进行试装评审,验证措施合格后下发更改单。针对着车后搭接处异响问题进行重新评估,并出具改进方案落实第二次试装时间,并组织相关人员进行试装评审技术明确贴膜是否需要区分冬、夏两种状态,如需要则明确两种状态的区别及粘贴力是否存在差异采购提供升级报告,将问题进行升级采购部组织相关单位对贴膜进行封样评审
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
For traction models: The final inspection needs to provide faulty cars or problem videos, photos and models. For <br>the stuck problem, pull the supervisor design and AUDIT for review. Standards are agreed. <br>Incorporate the problem of the side sign lights/side turn signals/signal lights not being integrated into the comprehensive control, and South Square confirms the repair status. <br>Temporary inspection standards are formed according to the way of dropping, and the inspectors are trained to focus on controlling the dropping phenomenon. Statistics the failure rate. <br>In response to the problem of abnormal sound of door opening and closing, it is required to feedback the fault point video to the improvement group to <br>organize external inspection, procurement, and R&D to evaluate together according to the supplier, and improve <br>according to the evaluation situation. According to the summary of electrical problems, the two ends of the connector Check the quality of the parts <br>. The problem that the lock hook cannot be screwed requires external inspection to pull the supplier's on-site service. The external inspection of the lock hook pulls the supplier's guarantee, and controls the incoming parts according to the size requirements marked on the drawing. (On-site inspection for unqualified products) <br>Compare and check the complete set of faulty and non-faulty parts of the faulty car. <br>"Project transfer to manufacturing. <br>1. Make OK standards for the wiring harness rubber cap installation, and pull the quality to confirm on the spot. <br>2. The harness is not installed in place. "100% online repair" <br>pulls the designer to confirm the problem. If increasing the torque value can eliminate the problem, it is recommended to write a contact form to request the design to change the torque requirements. <br>Re-receipt the project and issue an improvement plan by next Tuesday. <br>Organize the general assembly and quality personnel to conduct trial assembly review according to the trial assembly plan, and issue a change order after the verification measures are qualified. <br>Re-evaluate the problem of abnormal noise at the junction after the car, and issue an improvement plan to <br>implement the second trial installation time, and organize relevant personnel to conduct a trial installation review <br>technology to determine whether the film needs to be distinguished between winter and summer. If necessary, Clarify the difference between the two states and whether there is a difference in adhesive strength. <br>Provide an upgrade report for <br>procurement , and upgrade the problem. Procurement Department organizes relevant units to conduct a sample review of the film.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
For towing models: Final inspection requires video of the faulty car or problem, photos and models<br>Review the supervisor design and AUDIT for the stuck issue. Standards are agreed upon.<br>The side sign/side turn light/profile light is not on and controlled in a comprehensive manner, and the South Square confirms the repair status.<br>According to the shedding mode to form a temporary inspection standard, training inspectors to focus on the phenomenon of shedding control. Statistics of shedding failure rate.<br>Request feedback into the improvement group of video shots of fault points for door opening and closing noise<br>Organization of out-of-country inspection, procurement, research and development together by supplier assessment, according to the assessment of the situation to improve<br>Check the quality of components at both ends of the plug based on the summary electrical class problems<br>The problem with the lock hook not moving requires the external inspection to pull the supplier's on-site service. Lock hook dimension inspection pull supplier guarantee, and in accordance with the dimensions indicated in the drawings to control the incoming parts. (On-site inspection of non-conforming products)<br>Compare and inspect the faultvehicle to remove the whole fault and the non-fault parts<br>"Project-to-manufacturing<br>1, for the harness rubber cap installation to develop OK standards, and pull the quality of on-site confirmation<br>2, the harness is not installed in place requirements 100% online repair"<br>Pull the designer to confirm the problem, such as increasing the torque value can eliminate the problem, it is recommended to write a contact order to request the design change torque requirements.<br>Re-receipt for the project and an improvement plan is issued by next Tuesday.<br>Organization of assembly and quality personnel according to the trial installation plan for test-loading review, verification measures qualified after the release of change orders.<br>Re-evaluate the noise issue at the back of the car and produce an improvement plan<br>Implement the second trial installation time, and organize relevant personnel to carry out trial installation review<br>Technically clear whether the film needs to distinguish between winter and summer states, if necessary, to clarify the difference between the two states and whether there is a difference in the paste force<br>Purchases provide upgrade reports to upgrade issues<br>The purchasing department organizes the relevant units to conduct a sample review of the film
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
For traction vehicles: video, photos and models of faulty vehicles or problems shall be provided for final inspection<br>Pull the supervisor design and audit to review the sticking problem. Standards are agreed.<br>The problem that the side marker lamp / side turn signal lamp / position lamp is not on will be brought into comprehensive control, and the South Square will confirm the repair status.<br>The temporary inspection standard is formed according to the falling off mode, and the inspectors are trained to control the shedding phenomenon. The falling failure rate was counted.<br>To solve the problem of abnormal sound when the door is opened and closed, it is required to take video of the fault point and feed it back to the improvement group<br>Organize external inspection, procurement, R & D together to evaluate the supplier, and improve according to the evaluation<br>Check the quality of the parts at both ends of the connector according to the summarized electrical problems<br>The problem that the locking hook cannot be screwed requires external inspection to pull the supplier to provide on-site service. The external inspection of lock hook size shall pull the supplier's guarantee, and control the incoming parts according to the size requirements indicated in the drawing. (there are unqualified products in the on-site investigation)<br>The whole set of fault parts and non fault parts are compared and checked<br>"Project to manufacturing<br>1. Make OK standard for the installation of wire harness rubber cap, and confirm the pull quality on site<br>2. Wiring harness not installed in place requires 100% on-line repair“<br>Pull the designer to confirm the problem. If the problem can be eliminated by increasing the torque value, it is suggested to write a contact list to require the design to change the torque requirements.<br>For the project re receipt, and issued the improvement plan before next Tuesday.<br>Organize the general assembly and quality personnel to carry out trial assembly review according to the trial assembly plan, and issue the change order after the verification measures are qualified.<br>The abnormal noise at the lap joint after landing is reevaluated and the improvement scheme is provided<br>Implement the second trial assembly time, and organize relevant personnel to carry out trial assembly review<br>Technology to determine whether the film needs to distinguish between winter and summer, if necessary, the difference between the two states and whether there is difference in adhesion force<br>Purchasing provides upgrade report to upgrade the problem<br>The purchasing department shall organize relevant units to review the sealing sample of the film<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: