Tunnel road grass-roots concrete by the mixing station centralized mixing, the use of concrete tanker transport to the tunnel use, mixing station leakage drop difference should not be greater than 2m. In the transport process to ensure that no leakage, constant dry, do not separate analysis, discharge as far as possible do not pile up too high, discharge height should not exceed 1.5m.