The Contractor shall provide to the Sub-Contractor such portion of the quarry and borrow areas whereby the Sub-Contractor shall produce, process and stock pile materials required for the Sub-Contract Works in such manner as the Sub-Contractor is able to achieve the production required in accordance with the Sub-Contract Work Programme.