The horizontal shrinkage gap of the concrete face slab of the tunnel in this contract section is 5m, and the longitudinal shrinkage gap is set between the plates
The spacing of transverse contraction joints of the concrete surface slab of the tunnel in the contract section is 5m, and the longitudinal contraction joints are set between plates