After dry-out, Kunlun should control pressure within CS requirements and add a pressure controller at the outlet of theirstation to avoid Pressure fluctuations. Kunlun should define alarms on their system and have history of alarms. Quick communication to DCS if Pressureincrease/decrease. Rockwell DCS system should have a record of SIS defaults / interlock tripping to allow analysis and understand root-causeof tripping. Currently, after reset all records are deleted.