DECISION POINTThe lab process was still not at the level of four-sigma performance on turnaround time. The lab administrator searched for the causes of the off-center turnaround time distribution. She discovered periodic backlogs at a key piece of testing equipment. Acquiring a second machine provided the capacity to reduce the turnaround times to four-sigma capability.