Organize the assembly and quality personnel to conduct trial assembly review, issue a change list after verification <br>and re-evaluate the abnormal noise problem at the junction after the vehicle, and issue an improvement plan to <br>implement the second trial assembly time, and organize relevant personnel to conduct trial assembly The evaluation <br>technology clarifies whether the film needs to be distinguished between winter and summer; the difference between the two states and the adhesion force require the <br>purchase to provide an upgrade report, and the problem is upgraded. The <br>relevant department of the procurement department organizes the relevant unit to conduct a sample review of the film
正在翻译中..