 3. For Department Store Operators ONLYa. Typical ventilation and air的简体中文翻译

 3. For Department Store Operators

 3. For Department Store Operators ONLYa. Typical ventilation and air-conditioning will be provided through the mall common area HVAC system.b. Additional ventilation shall be provided by the Operator at Operator’s cost for special shops, such as food, cafe or odor producing shops, as per Owner’s or Manager’s approval.5.11 Permanent Power Supply and Chilled Water Supply1. Application for Permanent Power Supplya. Self insulation resistance test shall be completed and report shall be attached.b. MCB unit shall all be opened and MCB board shall be locked with photo provided.c. MCB board schematic showing the circuitry shall be included.d. The Operator should fill in the attached application form (Appendix N) with documents attached and submit to the Owner and the Manager at 7 days in advance.e. After approved by the Owner and the Manager, a joint site inspection would be required if any to ensure the electrical safety before DSC power on.2. Application for Permanent Chilled Water Supplya. Water sample shall be collected from the flushing and a page of photo record showing the water sample quality (color) shall be attached for the proof.b. The Operator should fill in the attached application form (Appendix O) with photo and pressure test report included and submit to the Owner and the Manager at 7 days in advance.c. After approved by the Owner and the Manager, the Owner and the Manager will inform DSC for the chilled water supply
0/5000
源语言: -
目标语言: -
结果 (简体中文) 1: [复制]
复制成功!
3.对于百货运营商只有<br>一个。典型的通风和空调将通过商场公共<br>区域的暖通空调系统提供。<br>湾 <br>根据业主或经理的<br>批准,运营商应为特殊商店(例如食品、咖啡馆或产生气味的商店)提供额外的通风,费用由运营商承担。<br>5.11 永久电源和冷冻水供应<br>1. 永久电源的申请<br>a.应完成自绝缘电阻试验并附上报告。<br>湾 MCB 单元应全部打开,MCB 板应锁上并提供照片。<br>C。应包括显示电路的 MCB 板示意图。<br>d. 经营者应填写所附申请表(附录N)并附上<br>文件,并提前7天提交给业主和管理人。<br>e. 经业主和管理人同意后,<br>如有需要,需进行联合现场检查,以确保DSC上电前的用电安全。<br>2. 永久冷冻水供应申请<br>a.冲水时采集<br>水样,并附一张水样质量(颜色)照片记录作为证明。<br>湾 经营者应填写随附的申请表(附录O),并附照片<br>和压力测试报告,并<br>提前7天提交给业主和管理人。<br>C。经业主和管理人批准后,业主和管理人将<br>通知 DSC 进行冷冻水供应
正在翻译中..
结果 (简体中文) 2:[复制]
复制成功!
 3.只供百货公司经营者使用<br>A.典型的通风和空调将通过商场公共区域提供<br>区域暖通空调系统。<br>B特殊情况下,操作员应自费提供额外通风<br>商店,如食品、咖啡馆或产生气味的商店,根据业主或经理的指示<br>批准<br>5.11永久电源和冷冻水供应<br>1.永久供电申请书<br>A.应完成自绝缘电阻测试并附上报告。<br>BMCB单元应全部打开,MCB板应锁定,并提供照片。<br>C应包括显示电路的MCB板示意图。<br>D操作员应在随附的申请表(附录N)中填写以下内容:<br>随附文件,并提前7天提交给业主和经理。<br>E经业主和经理批准后,将进行联合现场检查<br>如果需要,确保DSC通电前的电气安全。<br>2.永久冷水供应申请书<br>A.应从冲洗中采集水样,并提供一页照片记录,显示<br>附水样质量(颜色)证明。<br>B操作员应填写随附的申请表(附录O),并附上照片<br>包括压力试验报告,并在7天内提交给业主和经理<br>提前<br>C经业主和经理批准后,业主和经理将<br>通知DSC冷冻水供应
正在翻译中..
结果 (简体中文) 3:[复制]
复制成功!
 3.仅适用于百货商店经营者a.典型的通风和空调将通过商场公用设施提供区域暖通空调系统。b.额外通风应由操作员提供,费用由操作员承担根据业主或经理的要求,商店,如食品、咖啡馆或产生气味的商店批准。5.11永久电源和冷冻水供应1.永久电源的应用a.应完成自绝缘电阻测试,并附上报告。b.主断路器装置应全部打开,主断路器板应锁定,并提供照片。c.应包括显示电路的MCB板示意图。d.操作员应填写随附的申请表(附录N),内容如下文件附后,并提前7天提交给业主和经理。e.经业主和经理批准后,将进行联合现场检查在DSC通电前,需要确保电气安全。2.永久冷冻水供应申请a.应从冲洗中收集水样,并提供一页照片记录应附上水样质量(颜色)作为证明。b.操作人员应在随附的申请表(附录O)中填写照片和压力测试报告,并在7天内提交给业主和经理提前。c.经业主和经理批准后,业主和经理将通知DSC冷却水供应
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: