When laying mortar, the vertical mortar joint should be constructed by the combination of batching and adding mortar. During construction, it is strictly forbidden to use water to flush mortar to fill joints, and it is not allowed to use other building materials to plug mortar joints, such as stones, wooden wedges, etc. During masonry, the surface of mortar joint shall be cleaned along with the masonry, so that the masonry height shall not be greater than 4 bricks, and the original mortar pressure joint shall be flush with the wall in the pointing process. The horizontal mortar joint shall not be less than 90%, the vertical mortar joint shall not be less than 85%, and the masonry horizontal and vertical joints shall not have blind joints, cracks, transparent joints, etc.<br>