Pull the external inspection department to confirm the failed vehicles, <br>clarify the standard operation document requirements and control the area to <br>refine the assembly process of the production line, and issue the OK standard <br>requirements for the problem points. The improvement conclusion will be made before August 28
正在翻译中..