Control of meteorological data. Contact your local meteorological department, regular access to weather information, grasp the year, month, ten days rainfall trends, particularly the recent forecasts of rainfall and rainfall time in order to arrange production. <br>The development of the construction program and the establishment of the rainy season rainy season construction management agency organization, make arrangements for rain at the construction site, construction has not yet completed road maintenance good use of cover for protection. Mixing field and the construction site Anti request for a hearing to consider. <br>Use rainy day, good maintenance of construction machinery, avoid mechanical reasons caused sunny discontinued. <br>Carried out within the industry, data compilation, construction design, learning the technical specifications, familiar with the construction drawings, construction carried out by a number of exchange activities. <br>In the mixing field fortification rain shed, ready enough waterproof rain cloth, into the foot well engineering materials, can be carried out to prepare for the rain of steel processing, template installation, construction of concrete can be carried out after the rain delay. <br>During the rainy season, the water content of gravel material vary widely, often require the measurement, to adjust the amount of water, cement to be noted that the storage period, to prevent leaks and moisture. <br>Investigate, understand and master the construction section of the catchment area and the water regime over the years, the construction sector in the investigation bridge structures and artificial drainage system is smooth and reliable, to be clear in advance and protection against rain affecting the construction site.
正在翻译中..