There are two main situations, pretreatment influence + "uncontrollable" factors. <br>The time to wait for the pretreatment to start milk supply or the start of CIP/disinfection is a special technical shutdown; <br>Note 1: No matter what causes the waiting for feeding problem, it belongs to the special technical shutdown. <br>Note 2: The filling worker in front of a certain filling line is not clear about the cause on the spot. This often requires the planner and the pre-processing team leader to discuss together to distinguish the real cause of waiting for milk and waiting for CIP (sometimes, It may be a chain reaction caused by the technical downtime of other machines in the later section. Sometimes, it may really just be that a pre-processing operator has made a short run and forgot to configure the acid-base solution). Therefore, don't leave difficult problems to the filler who drives a certain machine to solve, just put it in the waiting for milk, waiting for CIP, that is, the special technical shutdown. <br>●Under the requirements of the factory’s quality documents, the production equipment will be cleaned from time to time (such as cleaning sheet debris, cleaning heat seal residue, cleaning cutter residue, cleaning nozzles, etc.); <br>●Quality defective raw materials or Quality problems (caused by raw materials) found after packaging materials (such as packaging materials, fruit particles, flavors, etc.) on the machine; <br>●Short stop of the machine when replacing similar packaging material rolls without replacement. For example: replacing standard molds or other packaging materials (labels, films, sheets, cartons, etc.), which is also a bottleneck of the machine, which must be shut down to complete; <br>●Can change: In the case of non-replacement, due to can change The short stop is included in the special technical stop. <br>●Due to the incompatibility between product features and machine functions, the time lost when running the production line at a lower speed. <br>Note 1: Special technical shutdown refers to how much the shutdown has to do with technology. This type of shutdown often requires some technical transformation (still a key improvement target of the equipment department/engineering department) before it can be significantly reduced.
正在翻译中..