The Defects Liability Certificate for the Works shall, within 28 days 的简体中文翻译

The Defects Liability Certificate f

The Defects Liability Certificate for the Works shall, within 28 days after the expiration of the Defects Liability Period, be issued by the Engineer, or, if different defects liability periods become applicable to different Section or parts of the Permanent Works, the expiration of the latest such period, or if, pursuant to Clause 82, any works instructed are completed to the satisfaction of the Engineer, the Defects Liability Certificate therefor shall be issued by the Engineer as soon as possible.
0/5000
源语言: -
目标语言: -
结果 (简体中文) 1: [复制]
复制成功!
工程的缺陷责任证书应在缺陷责任期届满后 28 天内由工程师签发,或者,如果不同的缺陷责任期适用于永久性工程的不同部分或部分,则缺陷责任期届满最晚的这个期限,或者如果根据第 82 条,任何指示的工程完成并让工程师满意,工程师应尽快为此颁发缺陷责任证书。
正在翻译中..
结果 (简体中文) 2:[复制]
复制成功!
工程的缺陷责任证书应在缺陷责任期到期后28天内由工程师签发,或者,如果不同的缺陷责任期适用于永久工程的不同部分,则为最新的缺陷责任期到期,或者如果根据第82条,任何指示的工程均按工程师的要求完成,因此,工程师应尽快签发缺陷责任证书。
正在翻译中..
结果 (简体中文) 3:[复制]
复制成功!
工程的缺陷责任证书应在缺陷责任期到期后的28天内由工程师签发,或者,如果不同的缺陷责任期适用于永久工程的不同部分,则在最近的缺陷责任期到期后签发,或者,如果根据第82条,任何指示的工程已完成并令工程师满意,则工程师应尽快签发缺陷责任证书。
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: