Wiring and linkage:<br> Check that the secondary circuit wiring inside the organization is correct; Sulfur hexafluoride gas in the circuit breaker reaches the rated pressure; The opening and closing position of the position indicator is consistent with the actual opening and closing state of the circuit breaker.<br> Connect the cable and send power, and carry out the electric opening and closing test. First, carry out the slow opening and closing operation, and then carry out the fast opening and closing operation.<br> Electrical test:<br> Measure the resistance of the conductive loop, and judge whether the contact is damp or oxidized; Check the operating mechanism and measure the insulation resistance of the opening and closing coils to determine whether the operating mechanism of the circuit breaker is rusted and whether the components of the secondary circuit are damp and oxidized; Insulation resistance and AC withstand voltage test, and judge the damp condition of insulation pull rod, interrupter of circuit breaker and overall insulation.
正在翻译中..