工程竣工资料管理工作是工程建设过程中不可或缺的一项重要工作,是一项系统工程。要保证工程竣工资料完、准确、系统、齐全、真实地记录和反映施工及验的英语翻译

工程竣工资料管理工作是工程建设过程中不可或缺的一项重要工作,是一项系统

工程竣工资料管理工作是工程建设过程中不可或缺的一项重要工作,是一项系统工程。要保证工程竣工资料完、准确、系统、齐全、真实地记录和反映施工及验收的全过程,就必须不断加强建设单位、监理和施工单位的管理水平,从而为建设一流工程项目提供资料方面的保证。如现场技术交底、图纸会审,设计变更文件、施工作业记录(焊接记录、天气情况、日期、作业人员等),各项报验单及签证单等,按规定格式装订成册等竣工验收后进行整理归档,以便于今后的查找和可追溯性。 
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
Project completion data management is an integral part of the construction process is an important work, is a systematic project. To ensure completion of the project data complete, accurate, systematic, complete, true record and the entire process reflects the construction and acceptance, we must continue to strengthen the construction unit, management supervision and construction units to provide information on aspects of the construction of a first-class project Guarantee. Such as on-site technical tests, examination of working drawing, document design changes, construction work records (welding records, weather, date, worker, etc.), the post-mortem report and other single and single visa, according to the prescribed format bound into books, etc. After completion and acceptance prepared for the archives, in order to facilitate future search and traceability. 
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
The management of engineering completion data is an indispensable and important work in the process of engineering construction, and it is a systematic project. In order to ensure that the completion of the project materials, accurate, systematic, complete, truthful record and reflect the whole process of construction and acceptance, it is necessary to constantly strengthen the construction unit, supervision and construction unit management level, so as to provide information for the construction of first-class projects to ensure. Such as on-site technical bottoming, drawings triage, design change documents, construction work records (welding records, weather conditions, dates, operators, etc.), inspection documents and visa documents, etc. , in accordance with the prescribed format bound into a book, such as the completion of the acceptance of the filing, in order to facilitate future search and traceability. 
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
Project completion data management is an indispensable and important work in the process of project construction, which is a systematic project. In order to ensure that the completion data of the project is complete, accurate, systematic, complete and true to record and reflect the whole process of construction and acceptance, it is necessary to continuously strengthen the management level of the construction unit, the supervisor and the construction unit, so as to provide data assurance for the construction of first-class project. Such as on-site technical disclosure, joint review of drawings, design change documents, construction operation records (welding records, weather conditions, dates, operators, etc.), various inspection application forms and visa forms, etc., which are bound into volumes according to the specified format, etc. after completion acceptance, they shall be sorted and filed, so as to facilitate future search and traceability.  
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: