There are differences in the actual construction environment of building projects, and different geological conditions and climates may result in different construction schemes. Therefore, in order to ensure that the frame-shear wall structure can play its original function effectively, it is necessary to carry out comprehensive construction, the construction site is inspected strictly, and the environment of the construction site is analyzed deeply, and the real site data is used to lay the foundation for scientific construction scheme. In order to ensure the effect of survey on construction site, it is necessary to realize centralized and unified management, and to divide the execution team according to different survey directions, so as to ensure the surveyors clear their own tasks. In the preliminary preparation, a professional designer should design the construction scheme of the frame shear wall according to the field survey results, comprehensively consider the cost and progress on the basis of the construction project standard, and mark out the important and difficult points of construction, carry Out in-depth analysis around dangerous points of construction and Construct Emergency Plan. In order to guarantee the construction quality, the basic training can be carried out after the construction design scheme is completed to ensure that the constructors of frame-shear wall structure can carry out the construction according to the standard. In addition, in the preparatory work for the construction technology of frame-shear wall structure, it is necessary for professional quality inspectors to carry out quality inspection around the material and equipment. For example, when checking the quality of reinforced materials, they should ensure that their technical parameters meet the standards, to avoid such problems as confusion of specifications, damage and corrosion of reinforcing bars, if problems such as poor weldability, Brittle fracture of reinforcing bars and insufficient mechanical properties are found in the course of quality inspection, the batch of reinforcing bars shall be handled and stopped in time, and at the same time, the special chemical composition of the steel bars can be tested by sampling each batch. First of all, it is necessary to carry out the weight deviation test to ensure the accuracy of the bending and tensile test, and double-check to ensure the accuracy of the test results. After material testing, construction equipment should be strictly checked and controlled to ensure construction quality to the greatest extent. In the actual construction planning, a long boom crane can be installed on the structural side of the main building to ensure that it can cover the entire staircase, and can complete the transportation of building materials in the actual construction. In addition, a cutting machine and a straightening machine are set up on the construction site to process steel bars of building materials, and several mixers are added according to the construction plan to ensure the following construction smoothly. With the rising of the building floor, the equipment such as freight elevator and passenger elevator should be used to check the quality of the related equipment and strengthen the safety protection in the construction preparation stage. The Scientific and effective pre-quality inspection lays the foundation for the following orderly and safe construction, circumvents the construction problems, and makes the frame-shear wall structure to play an effective role.