The FRP Manufacturer shall prove competence through quality systems and qualification testing of these joints as detailed in the inspection and testing plan (ITP). Design calculations and joint procedures shall also be provided by the FRP manufacture for the overlay widths and thickness requirements for all joint sizes. Joints shall be as stronger than the adjoining piping.