Construction process control: during the construction, the masonry axis shall be set out by the full-time setting out staff, and the masonry can be started only after the foreman passes the line inspection. In masonry, we should guide the way with model, and insist on self inspection, mutual inspection and handover inspection. After the completion of each construction process, the migrant workers can report to the foreman after self inspection, and report to the supervisor for acceptance after passing the inspection, and file the data in time.<br>