When the user connects the piping. First of all, pay special attention to the connection position of the hot side and cold side inlet and outlet pipes. When designing and selecting the heat exchanger, the design parameter table indicates that the heat inlet is the heat medium inlet, the heat outlet is the heat medium outlet, and the cold inlet is The cold medium inlet, and the cold out is the cold medium outlet. The installer must confirm the function of each piping before proceeding to connect the piping. Before piping is connected, it is necessary to carefully check whether there is any hard debris in the flow channel, so as not to block the flow channel or reduce the heat exchange efficiency during operation. The installation method of the pump is divided into rigid connection installation and flexible connection installation. (Depending on the specific situation by the customer)
正在翻译中..