Supplier shall prepare a detailed cut-up drawing (with positions of each specimen and quotes) to be discussed and approved during qualification activities. The cut-up drawing shall be enclosed into the Qualification Report. List of destructive test according to par. 4.1 of ITN07763.25 and referring to ITN07763.07 requirements are listed in table 3.