① Revise the "Engineering Change Control Procedures" to clarify the requirements for risk analysis and assessment of changes; Liu Zhenxing/2021-4-15 <br>Evidence: 2: The updated "Engineering Change Control Procedures" <br>② Implement standard clauses 8.5.6.1 for quality management personnel And the revised "Engineering Change Control Procedures" for a training; Liu Zhenxing/2021-4-20. <br>Evidence 3: Training records of standard clause 8.5.6.1 and "Engineering Change Control Procedure" training for quality management personnel.
正在翻译中..