JV should provide the documentation for the major equipment in terms of guarantee availability and reliability;The draft equipment list has been given by JV. CEM will provide the template (until 25/06/2021) for JV reference;JV should provide the O&M Manual for the FlyGT Pumps;JV should provide the Electrical and C&I Master List;JV should provide the O&M, Control and Logic Manuals for the Electrical and C&I;JV should provide the Key Spare Part List;JV should confirm the scope of work in more details and double confirm the duration for the defined BQ: