1. 所有交楼修葺单经业主之交楼小组发出,各承判商必须在7内完成(交货期长之修葺时限另见附表),如业主之交楼小组核对已报完工之修葺单,发现有的英语翻译

1. 所有交楼修葺单经业主之交楼小组发出,各承判商必须在7内完成(交货

1. 所有交楼修葺单经业主之交楼小组发出,各承判商必须在7内完成(交货期长之修葺时限另见附表),如业主之交楼小组核对已报完工之修葺单,发现有遗漏情况,业主之交楼小组会出重做单要求再执,所有重做单必须 4日内完成(待料更换项目除外)。如业主要求部份单位提前完成修葺,Carcase Contractor亦需统筹修葺及跟进配合。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
1. All handover repair orders are issued by the owner's handover team, and each contractor must complete it within 7 days (see the attached table for the repair time limit with long delivery time). If the owner's handover team checks the repairs that have been reported as completed If any omissions are found, the team will issue a redo order for re-execution. All redo orders must be completed within 4 days (except for pending replacement items). If the owner requires some units to complete the repairs ahead of schedule, Carcase Contractor also needs to coordinate the repairs and follow up.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
1. All delivery repair orders are issued by the owner's delivery team, and all contractors must complete them within 7 days (see the attached table for the repair time limit with long delivery period). If the owner's delivery team checks the completed repair orders and finds any omission, the owner's delivery team will issue a redo order for re execution, and all redo orders must be completed within 4 days (except for the items to be replaced). If the owner requires some units to complete the repair in advance, the carcase contractor also needs to coordinate the repair and follow-up cooperation.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
1. All delivery repair orders are issued by the owner's delivery team, and all contractors must complete them within 7 days (see the attached schedule for the repair time with long delivery period). If the owner's delivery team checks the repair orders that have been reported for completion and finds any omissions, the owner's delivery team will issue a redo order to ask for it again, and all redo orders must be completed within 4 days (except the items to be replaced). If the owner requires some units to complete the repair in advance, truck contractor also needs to coordinate the repair and follow-up cooperation.
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: