1. At first, the supply of A2100 sealing strip is suspended, and the supplier is required to provide 3M glue purchase certificate.<br>2. Conduct adhesion test for unqualified adhesive strip<br>3. The General Assembly issues the operation documents again.<br>4. Send the contact list to the general assembly and suggest that the original packing of sealing strip shall be used for supply before the completion of design rectification.<br>
正在翻译中..