3.4.28 Sampling processThe sampling sequence and the status definition for BMW components is described in the document-house manufactured andThe sampling parts (including a labeled part) shall be presented to the client and its customer with acomplete measurement report in accordance with the planning specifications for every componentand every build phase pressed by the supplier free of charge.All corrective measures resulting from the measurement report discussion shall be taken care ofimmediately. The measures and their results shall be documented by the supplier.MFU for the defined part spectrum and thinning MFU shall be carried out for all parts defined duringthe FTB.The press-in element connections shall be tested and documented according to the part drawing oraccording to GS96008.