The basic construction stage area is large, and the construction site site is relatively limited, the top elevation of the entire base plate and the thickness of the platform has changed greatly, in order to facilitate the construction of the base plate, the bottom plate will be divided into sections according to the back pouring belt construction;
正在翻译中..