The final inspection organization analyzes the faulty vehicles, <br>pulls the quality and external inspections to troubleshoot the assembly process and subassembly process at the production site. And feedback the video. <br>Final inspection finds air leakage problem 100% feedback air leakage video <br>Final inspection finds air leakage problem 100% feedback air leakage video, replacement of faulty parts retention analysis The <br>structure of the relevant parts of the toolbox cover plate is compared with the structure of Mercedes-Benz models. <br>Write one page for the current situation of the problem to upgrade, and then <br>write a page of paper to upgrade the current situation of the problem. After the responsibility is transferred to the procurement, <br>the problem will be sorted into QC report materials, which will be reported <br>after the 8th improvement biweekly meeting and communication with the final assembly Questions were sorted into QC report materials, and reported at the 8th bi-weekly improvement meeting, <br>suggesting that the purchasing department organize technical center, quality, and manufacturing special meetings to review the status of parts and components, and jointly formulate improvement plans.
正在翻译中..