8 project points of intersection<br>The design scope of the contract project is the design content within the junction point of continuous discharge roller hearth furnace. Excluding low-voltage power supply, compressed air and other external energy public auxiliary facilities outside the handover point, this part of the design belongs to the buyer's design scope, the Seller shall provide basic technical parameters, and the buyer shall be responsible for the design and construction.<br>
正在翻译中..