The short-step method helps to reduce the closing time of the strut, improve the stress condition of the initial strut, and control the deformation of the surrounding rocks. When using the short step method, keep the following in mind: (1) The closure of the first all section must be completed within 30 m from the drilling surface or within 30 days from the start of the first half of the excavation. (2) If the initial support is greatly deformed or sunk, it must be closed beforehand. (3) Consider the minimum number of steps on the assumption that construction machinery will operate normally.