TS 33.6 Charging Stations (To be Confirmed and agreed to by both parties)The Contractor shall supply and install battery chargers to recharge the propulsion batteries of the electric busesprovided under the terms of this contract. The chargers will be located and installed at Forte’s Aurora facility.The Contractor shall provide and install the chargers along with all labor and material necessary to make the chargersfully operational. The delivery and installation of the chargers shall be complete prior to the delivery of the first bus, ifthe chargers are not vehicle mounted (not by internal combustion engines). Contractor is responsible for the design,utility coordination if necessary and permitting of the system.One charger per bus shall be provided.Installed chargers shall meet all applicable codes and manufacturer recommendations.The bus shall be equipped with a single charge socket connection, accessible on the outside of the vehicle under amaintenance door, allowing a supplied charging cable to be attached to the bus. Inside the vehicle, power shall bedistributed through a main distribution panel with individual circuit breakers and RCD/GFCI protection on the inputto the charging module or modules. Each charger circuit shall also be protected on the output stage to the battery packor packs.The installed chargers shall be designed and installed in such way that a single employee can safely connect (anddisconnect) the charger(s) to the bus(es) without the need for a ladder or any special tools.Installed chargers shall be specifically designed for charging the propulsion batteries installed on the buses provideunder this contract.On-site training for Forte employees on the use, maintenance, and repair of the chargers shall be included with anycontract, after Forte approved installation. Ten (10) copies of Instruction Manuals and Maintenance/Repair Manualsshall be delivered to Forte after approved installation is complete. Any necessary consumable products associated withthe use of these chargers for one year shall be provided.Any necessary equipment and tools necessary to maintain the chargers shall be provided.Chargers shall be capable of bringing propulsion batteries from a state of 0% charge to a state of sufficient charge tocomplete one round trip run charge in less than 15 minutes and fully charged (100%) in less than 4 hours.Chargers or vehicles shall have indicating lights or a display that very clearly display the state of operation the chargeris in (e.g., charging, not charging, etc.) and also display the percentage of charge the batteries are in (e.g., 65% charged).Chargers shall have an emergency shut off switch that is clearly marked, easily accessible and easily operable.The chargers shall be UL listed.
TS 33.6 Charging Stations (To be Confirmed and agreed to by both parties)<br>The Contractor shall supply and install battery chargers to recharge the propulsion batteries of the electric buses<br>provided under the terms of this contract. The chargers will be located and installed at Forte’s Aurora facility.<br>The Contractor shall provide and install the chargers along with all labor and material necessary to make the chargers<br>fully operational. The delivery and installation of the chargers shall be complete prior to the delivery of the first bus, if<br>the chargers are not vehicle mounted (not by internal combustion engines). Contractor is responsible for the design,<br>utility coordination if necessary and permitting of the system.<br>One charger per bus shall be provided.<br>Installed chargers shall meet all applicable codes and manufacturer recommendations.<br>The bus shall be equipped with a single charge socket connection, accessible on the outside of the vehicle under a<br>maintenance door, allowing a supplied charging cable to be attached to the bus. Inside the vehicle, power shall be<br>distributed through a main distribution panel with individual circuit breakers and RCD/GFCI protection on the input<br>to the charging module or modules. Each charger circuit shall also be protected on the output stage to the battery pack<br>or packs.<br>The installed chargers shall be designed and installed in such way that a single employee can safely connect (and<br>disconnect) the charger(s) to the bus(es) without the need for a ladder or any special tools.<br>Installed chargers shall be specifically designed for charging the propulsion batteries installed on the buses provide<br>under this contract.<br>On-site training for Forte employees on the use, maintenance, and repair of the chargers shall be included with any<br>contract, after Forte approved installation. Ten (10) copies of Instruction Manuals and Maintenance/Repair Manuals<br>shall be delivered to Forte after approved installation is complete. Any necessary consumable products associated with<br>the use of these chargers for one year shall be provided.<br>Any necessary equipment and tools necessary to maintain the chargers shall be provided.<br>Chargers shall be capable of bringing propulsion batteries from a state of 0% charge to a state of sufficient charge to<br>complete one round trip run charge in less than 15 minutes and fully charged (100%) in less than 4 hours.<br>Chargers or vehicles shall have indicating lights or a display that very clearly display the state of operation the charger<br>is in (e.g., charging, not charging, etc.) and also display the percentage of charge the batteries are in (e.g., 65% charged).<br>Chargers shall have an emergency shut off switch that is clearly marked, easily accessible and easily operable.<br>The chargers shall be UL listed.
正在翻译中..