Insulation adjacent to flanges in piping and equipment shall be terminated to allow removal of bolts without damage to that insulation. Bolt clearance from the flange to the insulation jacketing shall be at least the bolt length +30 mm.; for certain flange bolts, hydraulic bolt tension or torque equipment shall be used which requires greater bolt clearance. Mechanical/piping specifications should be consulted for these clearances.