We understand the impact of the outbreak on your procurement chain, but please also understand that we are suffering from the risk of downtime due to the absence of vacuum pumps, vacuum pump damage time of about September 18, has been 4 months, according to the previous operating conditions, we will generally take several vacuum pumps in turn to extend the life of the vacuum pump, but now the on-line vacuum pump has been running continuously for 4 months, we are really very worried about vacuum pump abnormal production line downtime. So be sure to coordinate with the supplier to speed up the progress and inform the delivery plan.<br> Regarding the unloading car, according to your assessment, the steel core support arm does not need to be replaced, although we do not agree with your opinion, we believe that the steel core support arm is removed from the damaged equipment, without effective evaluation can not ensure its material strength and quality, but before your company proposed that the component is not a problem, can be used, so we have to respect your opinion. At present, the parts of the unloading car has arrived, there is no supply problems, please hurry to arrange for engineers to the scene to guide the repair work, and for a period of time to try and observe, to eliminate this security risk.
正在翻译中..