6. Placement station: A. according to the production plan of the team leader on duty, collect the product model and components (connector, IC, capacitor and other materials) from the picking staff. Before loading, carefully check the P / N number of the materials. When loading, confirm the component model to be loaded according to the product location table and the placement position of the placement machine. It is not allowed to install the wrong components. After installing the components, make material records and find out the components The quality personnel shall confirm the loading information and sign on the loading list for confirmation. b. Start the shift to cooperate with the technician to do the first piece work well. C. For the board made on side B, confirm the polarity and bubble area of IC components according to X-ray.<br>
正在翻译中..