6.贴片工位:a.根据当班组长的生产计划到领料员处领取生产的产品型号元件(连接器、IC、电容等物料),在装料前必须仔细核对物料的P/N号,装的英语翻译

6.贴片工位:a.根据当班组长的生产计划到领料员处领取生产的产品型号元

6.贴片工位:a.根据当班组长的生产计划到领料员处领取生产的产品型号元件(连接器、IC、电容等物料),在装料前必须仔细核对物料的P/N号,装料时要根据产品的站位表和贴片机的站位确认需要上料的元件型号,不可以装错;安装好元件后,需要做物料记录并找品质人员确认装料信息,并在上料表上签字确认。b.开班配合技术员做好首件工作。C.对B面做好的板子要照X-RAY确认IC元件极性和气泡面积大小。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
6. SMT station: a. Pick up the product model components (connectors, ICs, capacitors and other materials) from the picker according to the production plan of the team leader, and you must carefully check the P/N of the materials before loading No., when loading, you must confirm the type of the component to be loaded according to the product's station table and the position of the placement machine, and you can't install it wrong; after installing the component, you need to make material records and find quality personnel to confirm the loading information. And sign the confirmation on the feeding table. b. Cooperate with technicians to start the first job. C. Confirm the polarity of the IC components and the size of the bubble area according to X-RAY on the board made on the B side.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
6. Patch station: a. According to the team leader's production plan to the picker to collect the production of product model components (connectors, ICs, capacitors and other materials), before loading must carefully check the material P/N number, loading according to the product's station table and patch machine station confirmation of the component model required to materialize, can not be misplaced; b. Start the shift with the technician to do the first work. C. The board made well on the B side should follow X-RAY to confirm the polarity of the IC element and the size of the bubble area.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
6. Placement station: A. according to the production plan of the team leader on duty, collect the product model and components (connector, IC, capacitor and other materials) from the picking staff. Before loading, carefully check the P / N number of the materials. When loading, confirm the component model to be loaded according to the product location table and the placement position of the placement machine. It is not allowed to install the wrong components. After installing the components, make material records and find out the components The quality personnel shall confirm the loading information and sign on the loading list for confirmation. b. Start the shift to cooperate with the technician to do the first piece work well. C. For the board made on side B, confirm the polarity and bubble area of IC components according to X-ray.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: