I have a very rough cost estimation; please see attachment.• Equipment cost is base on “1 set of production line with 2 spinning units”, because this is the setup that we used to produce the sample• The calculation is base on the sampling line speed of 0.5m/min• I’ve made the estimation of running the production line in 3 shifts, with 2 persons for 1 shift • I have yet to figure out the cost for waste disposal• I have yet to figure out the cost of substrate (in this case baking paper)