After cutting the cable pipe, the pipe must be passivated to prevent damage to the cable, but also on the tube port can be added to the soft plastic sleeve.
After the cable pipe is cut, the pipe orifice must be passivated to prevent damage to the cable, and soft plastic sleeve can also be added to the pipe orifice.