机具定位 准备工作完成后,插板机移位至施工区域,使套管对准板位标记。插板机就位后,进行调平、对中,调整桩机的垂直度,保证套管应与桩位一致,偏差应在 30mm 以内,钻孔垂直度误差小于 1.5%。打设前调试设备,调试后准备进行排水板施工。4.3.3.5 安装排水板 进场设备安装调试完成后,根据设计插板的深度要求,将插管长度定好。排水板从套管的插嘴拉入套管内部,固定在套管底部的插销上,同时拉紧排水板,依靠排水板与插销之间的摩擦力连接在一起,上提时插销从套管口与排水板端部抽出,套管提出,排水板靠泥土侧压力留在地基中。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
Positioning equipment <br>after preparations are completed, the shift to the construction area flapper machine, the alignment plate alignment mark the sleeve. After the interposer is in place, perform leveling, centering, and adjust the verticality of the pile driver to ensure that the casing should be consistent with the pile position, the deviation should be within 30mm, and the verticality error of the drill hole is less than 1.5%. Commission the equipment before installation, and prepare for the construction of the drainage board after commissioning. <br>4.3.3.5 drainage board mounting <br>approach device after installation is completed, depending on the depth requirements of the card design, will be a good length of the cannula. The drain plate is pulled into the inside of the sleeve from the spigot of the sleeve and fixed on the pin at the bottom of the sleeve. At the same time, the drain plate is tightened and connected together by the friction force between the drain plate and the pin. With the end of the drainage plate drawn out, the casing is raised, and the drainage plate is left in the foundation by the pressure of the soil side.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
Implement positioning <br>After the preparation is complete, the inserter shifts to the construction area so that the casing is aligned to the plate level marking. After the plate machine is in place, the leveling, alignment, adjusting the verticality of the pile machine, to ensure that the casing should be consistent with the pile level, the deviation should be within 30mm, drilling pertization error is less than 1.5%. Pre-set commissioning equipment, commissioning is ready to carry out drainage plate construction.<br>4.3.3.5 Installing the drainboard <br>After the installation and commissioning of the entry equipment is completed, the length of the intubation is set according to the depth requirements of the design insert. Draining plate from the intab of the casing into the casing, fixed on the bottom of the casing pin, while tightening the drainage plate, relying on the friction between the drainboard and the pin connected together, the upper lifting pin from the casing port and the end of the drainboard pulled out, the casing proposed, the drainboard on the soil side pressure left in the foundation.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
Machine location<br>After the preparation, the board inserting machine shall be moved to the construction area to align the casing with the plate position mark. After the board inserting machine is in place, it shall be leveled and aligned, and the verticality of the pile machine shall be adjusted to ensure that the casing pipe is consistent with the pile position, the deviation shall be within 30mm, and the drilling verticality error shall be less than 1.5%. Pre commissioning equipment is set up, and drainage board construction is ready after commissioning.<br>4.3.3.5 installation of drain board<br>After the installation and commissioning of the mobilization equipment is completed, the length of the intubation tube shall be determined according to the depth requirements of the design plug plate. The drainage plate is pulled into the casing from the spigot of the casing, fixed on the pin at the bottom of the casing, and the drainage plate is tightened at the same time. It is connected by the friction between the drainage plate and the pin. When lifting up, the pin is pulled out from the casing mouth and the end of the drainage plate. The casing is raised, and the drainage plate is left in the foundation by the pressure of the soil side.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: