Implement positioning <br>After the preparation is complete, the inserter shifts to the construction area so that the casing is aligned to the plate level marking. After the plate machine is in place, the leveling, alignment, adjusting the verticality of the pile machine, to ensure that the casing should be consistent with the pile level, the deviation should be within 30mm, drilling pertization error is less than 1.5%. Pre-set commissioning equipment, commissioning is ready to carry out drainage plate construction.<br>4.3.3.5 Installing the drainboard <br>After the installation and commissioning of the entry equipment is completed, the length of the intubation is set according to the depth requirements of the design insert. Draining plate from the intab of the casing into the casing, fixed on the bottom of the casing pin, while tightening the drainage plate, relying on the friction between the drainboard and the pin connected together, the upper lifting pin from the casing port and the end of the drainboard pulled out, the casing proposed, the drainboard on the soil side pressure left in the foundation.
正在翻译中..