We added two 76mm in the configuration list* 1.5m Drill pipe.<br>At the same time, the bill of lading is a complete set of hf385y equipment.<br>The rest of the accessories are listed in the list, please check.<br>In addition, we hope to pay part of the deposit by T / T first<br>
正在翻译中..