To be flat or basically flat, there should be enough drainage channels to ensure sufficient rainwater drainage capacity, so that there is no or less water in rainy days, and construction can be carried out immediately after rain. Strengthen the management of materials, equipment, components, semi-finished products and other engineering materials on the construction site to improve work efficiency.