Before shining, polish and clean the contact surface of the cast epoxy resin on the ship's hull. The whole stern tube can be put in place, aligned, adjusted, pressure tested, epoxy resin poured, accessories installed and other related work immediately after the shafting is lighted.<br>Compared with traditional boring, the integral stern tube eliminates the need for boring bars, boring bar alignment, boring, and grinding processes. This avoids the risk of boring tool breakage and difficulty in controlling the grinding after precision boring, resulting in excessive pressure input during the pressure bearing process of the front and rear axles of the stern tube, or even failure to press or burn. The overall stern tube is safe, fast, and efficient in installation.
正在翻译中..