In final inspection problems, 37.5% are problems that can be moved forward to the control of the production line<br><br>Interior line production beat 2 minutes 30 seconds, inspection beat average 2 minutes 40 seconds, main line production beat 5 minutes, inspection beat up to 5 minutes 10 seconds, work saturation seriously exceeded the standard, resulting in inspectors according to experience inspection, non-concern area problems out<br><br>There is no reasonable rest time, such as physiological needs or other needs to be removed from the job, which will lead to vehicle leakage.
正在翻译中..