An additional pump complete of AISI 316 basket pre-filter and filtration system on delivery to be installed in reserve connected in way to serve each system.Three tanks (abt. 300 l) are to be installed for chemical storage.Dosing pumps will be installed for chemical injection to serve all the systems.Each system will be stop in case water chemical parameters of UV efficiency are below required values.